Description du projet

This pedestrian bridge which is 75 meters long was erected over the promenade from the Ottawa airport to connect the Hunt Club area and the Southeast Transitway in Ottawa, Ontario. The bridge structure is composed of three steel orthotropic deck panels. The longest span measuring at 51 meters. The project involved complex manufacturing steps during assembly and soldering of components.

L’équipe de projet

Propriétaire: City of Ottawa

Ingénieur en structures: Delcan, A Parsons Company

Directeur de projet/entrepreneur généralLouis W. Bray Construction

Fabricant: Canam-Ponts, division de Groupe Canam

Dessinateur: Canam-Ponts, division de Groupe Canam